4 April 2012

Its an Easter Update

Apologies for the lack of posts. Quite frankly I have been very tired due to night surveying on the M5. Now in the office in Taunton this week although we did visit the A303 to finish a job we started at Christmas. We needed to get to drainage we knew was there but is far too dangerous to get to at night. So today has been rummaging about in the undergrowth and up and down embankments. Damn you brambles!

The previous two weeks on the M5 went well. Struggled a bit with nights this time but I think it was because I knew it was short term and would be back on days. It does really throw your body out of sync but I guess you must get used to it after a number of years.

As The Highways Area 2 contract is changing ownership, Upstream do not know whether they will get a new contract from the new owners. I am therefore guaranteed work until the end of June. After that, nobody knows, so worrying times ahead.

Connectivity surveys have now been stopped and it looks as though we will start surveying drainage at risk of flooding in a couple of week’s time. Should be interesting for us.

Looking forward to the gold this weekend. Wondering if Tiger can win a big one again. Going to be very excited. For those with a 3D TV it is going to be superb to see the balls rolling down the greens. Mike and I will also be having our own tournament on the Wii. Best keep the stakes low.

Have a great Easter.